Subsea Global Solutions has revolutionized the underwater methods of repair of rudders and stabilizers. By using underwater cofferdams (either atmospheric or hyperbaric), fully approved mechanical or weld repairs can be performed to rudders and stabilizers. If underwater removal or extraction is required for a rudder or stabilizer, Subsea Global Solutions floats damaged stabilizers or rudders away from the vessel using the aqueous environment as a crane. Buoyancy control solutions have been developed for underwater lifts up to 300 tons. Underwater seal replacement, including bonding of new seal rings, is possible for stabilizers without taking the vessel out of service.
Permanent underwater wet weld repairs to eroded rudder surfaces and weld seams, dewatering of rudder blades and mechanical repairs to Hi-Lift rudders is all available globally through the expert technicians of Subsea Global Solutions.
See how Subsea Global Solutions performs underwater rudder/stabilizer exchanges and repairs.
Class approved shell plate underwater damage repairs to offshore semi-submersible platform without drydocking.
View Full Case StudyDuring cargo operations, a submerged pile pierced through the hull. Subsea Global Solutions worked together with owner and class to develop repair plan that included the design and installation of an engineered cofferdam.
View Full Case StudyThe installation of complete SOx scrubber systems is entirely possible without taking the vessel out of the water. Subsea Global Solutions' involvement is focused on precision cutting of the hull penetrations for the sea chest openings and overboard spool pipe installation below the waterline.
View Full Case StudyA Blue-Chip oil & gas company incurred several defects and cracks in a critical attachment member of an FPSO’s hull – these defects required repair to allow continued operation.
View Full Case StudyDesign flaws together with poor workmanship caused the bilge keel to fracture during operation in several locations. Subsea Global Solutions worked together with the owner and Class to perform permanent underwater wet weld repair on the fractures, without interrupting the production.
View Full Case StudyThe installation of complete SOx scrubber systems is entirely possible without taking the vessel out of the water. Subsea Global Solutions' involvement is focused on precision cutting of the hull penetrations for the sea chest openings and overboard spool pipe installation below the waterline.
View Full Case Study3 month out of dry dock, galvanic corrosion caused heavy cavitation/erosion damage on PORT and STBD side rudders.
View Full Case StudySubsea Global Solutions can restore your propeller blades as a permanent repair, to OEM design geometry by cold static loading with our underwater propeller blade press.
View Full Case StudyThe benefits of removing a damaged bow thruster afloat are many. The customer was able to prevent further damage to the bearings and gears caused by the presence of seawater in the gear housing and the procedures allows the units to be overhauled prior to the vessels next dry-dock—or, they can be re-installed afloat by Subsea Global Solutions, which would help to eliminate the need for additional tug cost.
View Full Case StudyThe project was executed with two Subsea Global Solutions teams working around the clock. While the vessel trimming process was in motion, the team onboard the vessel began to drain the oil from the thruster while the dive team began removing the bow thruster tunnel gratings to gain full access to the bow thruster.
View Full Case StudySubsea Global Solutions started its underwater repair process by establishing load-rated rigging points above the propeller using 4F Class A wet welding procedures to allow safe new replacement propeller blade transfer of the propeller blades.
View Full Case StudySubsea Global Solutions solves serious problems: Assisting a large fully laden Post-Panamax container vessel with steering issues. Subsea Global Solutions works with port authorities, class, and manufacturers to provide class-approved in-water float out removal, repair, and refit of a 110 mt rudder. Find out how our underwater inspection and survey services deliver practical, cost-effective solutions to a complex offshore problem. Subsea Global Solutions works with port authorities, class, and manufacturers to provide class-approved in-water rudder float out removal, repair, and refit of a 110 mt rudder. Helping owners safely reduce their risk exposure and related costs that would include diversions, delays, and downtime.
View Full Case StudyDuring cargo operations, a submerged pile pierced through the hull. Subsea Global Solutions worked together with owner and class to develop repair plan that included the design and installation of an engineered cofferdam.
View Full Case StudyThe installation of complete SOx scrubber systems is entirely possible without taking the vessel out of the water. Subsea Global Solutions' involvement is focused on precision cutting of the hull penetrations for the sea chest openings and overboard spool pipe installation below the waterline.
View Full Case Study3 months out of dry dock, galvanic corrosion caused heavy cavitation/ erosion damage on PORT and STBD side rudders.
View Full Case Study3 month out of dry dock, galvanic corrosion caused heavy cavitation/erosion damage on PORT and STBD side rudders.
View Full Case StudySubsea Global Solutions can restore your propeller blades as a permanent repair, to OEM design geometry by cold static loading with our underwater propeller blade press.
View Full Case StudyDesign flaws together with poor workmanship caused the bilge keel to fracture during operation in several locations. Subsea Global Solutions worked together with the owner and Class to perform permanent underwater wet weld repair on the fractures, without interrupting the production.
View Full Case StudyThe benefits of removing a damaged bow thruster afloat are many. The customer was able to prevent further damage to the bearings and gears caused by the presence of seawater in the gear housing and the procedures allows the units to be overhauled prior to the vessels next dry-dock—or, they can be re-installed afloat by Subsea Global Solutions, which would help to eliminate the need for additional tug cost.
View Full Case StudyThe project was executed with two Subsea Global Solutions teams working around the clock. While the vessel trimming process was in motion, the team onboard the vessel began to drain the oil from the thruster while the dive team began removing the bow thruster tunnel gratings to gain full access to the bow thruster.
View Full Case StudySubsea Global Solutions started its underwater repair process by establishing load-rated rigging points above the propeller using 4F Class A wet welding procedures to allow safe new replacement propeller blade transfer of the propeller blades.
View Full Case StudyAnother happy client back to business: 3800 CPM of sand & silt dredged in a short time window, and under budget! Read the full case study here.
View Full Case StudyDuring cargo operations, a submerged pile pierced through the hull. Subsea Global Solutions worked together with owner and class to develop repair plan that included the design and installation of an engineered cofferdam.
View full case study3 month out of dry dock, galvanic corrosion caused heavy cavitation/erosion damage on PORT and STBD side rudders.
View full case studyDesign flaws together with poor workmanship caused the bilge keel to fracture during operation in several locations. Subsea Global Solutions worked together with the owner and Class to perform permanent underwater wet weld repair on the fractures, without interrupting the production.
View full case studyThe client indicated that the tailshaft had shifted aft approximately 200 mm when the ship’s crew was doing maintenance on the shaft coupling. It resulted in the aft water seal losing contact with the liner, causing large amounts of water ingress into the stern tube.
View full case studyThis complex underwater repair was completed to the client's satisfaction in 5 days in conjunction with various other repair works. Subsea Global Solutions managed both the underwater and internal portions of this repair to ensure each phase was executed seamlessly.
View full case studySubsea Global Solutions can restore your propeller blades as a permanent repair, to OEM design geometry by cold static loading with our underwater propeller blade press.
View full case studyClass approved shell plate underwater damage repairs to offshore semi-submersible platform without drydocking.
View full case studyThe benefits of removing a damaged bow thruster afloat are many. The customer was able to prevent further damage to the bearings and gears caused by the presence of seawater in the gear housing and the procedures allows the units to be overhauled prior to the vessels next dry-dock—or, they can be re-installed afloat by Subsea Global Solutions, which would help to eliminate the need for additional tug cost.
View full case studyThe project was executed with two Subsea Global Solutions teams working around the clock. While the vessel trimming process was in motion, the team onboard the vessel began to drain the oil from the thruster while the dive team began removing the bow thruster tunnel gratings to gain full access to the bow thruster.
View full case studyThe installation of complete SOx scrubber systems is entirely possible without taking the vessel out of the water. Subsea Global Solutions' involvement is focused on precision cutting of the hull penetrations for the sea chest openings and overboard spool pipe installation below the waterline.
View full case studySubsea Global Solutions solves serious problems: Assisting a large fully laden Post-Panamax container vessel with steering issues. Subsea Global Solutions works with port authorities, class, and manufacturers to provide class-approved in-water float out removal, repair, and refit of a 110 mt rudder. Find out how our underwater inspection and survey services deliver practical, cost-effective solutions to a complex offshore problem. Subsea Global Solutions works with port authorities, class, and manufacturers to provide class-approved in-water rudder float out removal, repair, and refit of a 110 mt rudder. Helping owners safely reduce their risk exposure and related costs that would include diversions, delays, and downtime.
View full case study3 months out of dry dock, galvanic corrosion caused heavy cavitation/ erosion damage on PORT and STBD side rudders.
View full case studySubsea Global Solutions has revolutionized the underwater methods of repair of rudders and stabilizers. By using underwater cofferdams (either atmospheric or hyperbaric), fully approved mechanical or weld repairs can be performed to rudders and stabilizers. If underwater removal or extraction is required for a rudder or stabilizer, Subsea Global Solutions floats damaged stabilizers or rudders away from the vessel using the aqueous environment as a crane. Buoyancy control solutions have been developed for underwater lifts up to 300 tons. Underwater seal replacement, including bonding of new seal rings, is possible for stabilizers without taking the vessel out of service.
Permanent underwater wet weld repairs to eroded rudder surfaces and weld seams, dewatering of rudder blades and mechanical repairs to Hi-Lift rudders is all available globally through the expert technicians of Subsea Global Solutions.