Technical Situation

Former tanker length 274 meter, 132,361Tons Gross Tonnage
During the conversation from a tanker toan FPSO, the bilge keel was modified.
Design flaws together with poor workmanship caused the bilge keel to fracture during operation in several locations.
Subsea Global Solutions worked together with the owner and Class to perform permanent underwater wet weld repair on the fractures, without interrupting the production.
Weld repairs still perform after more four years in service exposed to high hydrodynamic forces.