Underwater Bow Thruster Installation on a Nearly 300-Meter Passenger Ship
A nearly 300-meter passenger vessel operating in a high-traffic cruise terminal required the installation of a new bow thruster to support maneuverability and safe port operations. Due to the vessel’s size, operational schedule, and the need to avoid drydocking, the work had to be performed underwater while the ship remained afloat.
Read More >